Project overview
Phase 1 of the project is the first wind power plant in Soc Trang province. The wind turbines located nearshore in 7km and connected the shore thru the concrete-link-bridge
Project information
Rated power30 MW
Anual net energy94 million kWh
Status
In operation
Investor
Soc Trang Energy JSC
Start time
2020
Complete time
2021
Location
Vinh Hai Commune, Vinh Chau Town Soc Trang Province
Video
